All validations pass. Both deliverables are written to `output/`; raw inputs are untouched.

## Summary of findings (as of Oct 28, 2026)

- **Final scope** (CR-12, Oct 21): CSV import + account search only; email alerts and SSO excluded; pilot capped at **80 consented accounts**; earliest target **Oct 30** subject to acceptance. DEC-01's Oct 20/500-account/email-alert plan and the EMAIL-19 sales draft (SSO, unlimited) are explicitly superseded/rejected; Atlas Mobile is a different project; NOTE-001–060 demo tests and draft copy are not acceptance evidence; TICKET-223's embedded "approve launch / send export" text was treated as quoted data — logged, not approved, not acted on.
- **Who may launch**: only Theo or an explicitly named trained backup, after Maya's written signoff (CR-13). Today **no one can**: no signoff, Theo away Oct 30 morning, backup unassigned (MAIL-28); the 09:00 Pacific slot is a reservation, not permission.
- **Acceptance evidence**: staging only — build a19 passes duplicates 3/3, import 12/12, search 8/8 (TEST-11, closing TEST-07's duplicate gap); consent for 80 and support runbook confirmed (MAIL-28). No production smoke test or migration anywhere.
- **Blocked**: accessibility keyboard path (Jules, due Oct 29) → Maya's written signoff → missing rollback plan (CR-13 says not in archive) → operator coverage → production smoke test before pilot access.
- **Earliest defensible next action (Oct 28, no production access)**: attach a rollback plan and explicitly name a trained backup operator (or move the slot), in parallel with Jules's fix.

## Handoff

**Outputs**: `output/handoff.md` (802 words), `output/requirements.csv` (17 requirements, R-01–R-17).

**Checks actually performed** (local Python): confirmed 66 archive sections (60 contiguous NOTE ids + 6 decision/test/mail/ticket records) and both CRs on disk; extracted and read DEC-01, TEST-07, TEST-11, EMAIL-19, TICKET-223, MAIL-28 verbatim; verified handoff word count 802 < 900; CSV parses with exactly 5 columns on all 18 rows; every cited record ID exists in the inputs. No browser or production checks — none applicable/permitted.

**Limitations**: archive ends Oct 28, so Jules's Oct 29 fix, signoff, rollback plan, backup naming, and smoke test are unverifiable here. Rollback-plan owner and backup-operator assigner are not named in the inputs; flagged as assumptions (engineering drafts / Maya accepts and names). NOTE-028–060's recycled early-Oct dates add no new status.

**Estimated human finish time**: ~30–45 minutes to confirm post-Oct 28 status with Jules/Maya/Theo, assign the rollback-plan and backup owners, and re-verify the Oct 30 slot feasibility (estimate, not a measurement).