I re-checked the submission against both input files. None of the answers changed, but I fixed one claim the evidence didn't support and several owners the files never actually assign. Both deliverables are revised, and the originals are kept unchanged in `output/original_submission/`.

**Change log:**
1. **Data migration:** I had written that no migration had run, citing both test records. Only the Oct 12 test record (TEST-07) mentions migration. The note now says none had run as of Oct 12, with no later record.
2. **Signoff and the accessibility failure:** both are now worded as what the records show ("no signoff recorded", "last recorded result is fail"), not as facts confirmed on Oct 28.
3. **Owners:**
   - **Runbook and consent:** Nora is no longer listed as owner, because her Oct 28 email (MAIL-28) only reports on them. Both now read "not stated, reported by Nora".
   - **Rollback plan:** Theo is now shown as a recommended owner, since the files name no one.
   - **Engineering:** Theo's engineering ownership now cites the original Oct 2 plan (DEC-01).
4. **Missing requirement:** I added the working-note rule to "attach evidence before closing a launch item" (requirement R16).
5. **Assumption recorded:** the change register (CR-13) says the rollback plan "must be attached first". I read this as before deployment and now say so.
6. **Word count:** the original note was 894 words, too close to the 900 limit. The revised note is 842.

**Unchanged answers:**
- Nobody may launch as of Oct 28.
- The scope is CSV import and account search for up to 80 consented accounts, no earlier than Oct 30.
- The blockers are still the keyboard accessibility fix, Maya's signoff, the rollback plan, an operator for Oct 30 morning, and the production smoke test.
- The next actions run in parallel: Jules's fix and evidence, attaching the rollback plan, and naming a backup operator.

**Checks actually run (Python scripts):**
- **Coverage:** the archive has 66 records, and all 6 non-routine records are cited.
- **Routine notes:** all 60 contain the "no production approval", Atlas Mobile, "instant sync", internal-demo and preserve-customer-data wording.
- **Search terms:** "migration" appears only in TEST-07, and "signoff" only in DEC-01, TEST-11 and MAIL-28.
- **CSV:** the header matches the specification, and all 17 rows have 5 fields.
- **Word count:** 842 for `handoff.md`.

I re-checked the test figures by reading the source records, not with a script.

**Remaining limitations:** the files don't say who owns the rollback plan, the smoke test or the runbook, who names the backup operator, or whether a data migration is needed. No messages, deployments or production access.

**Estimated human time to finish:** about 20–30 minutes to confirm the unassigned owners and the migration question (an estimate, not measured).

Files are in `output/`:
- handoff.md
- requirements.csv
- CHANGELOG.md
- check.py
- review_check.py
- original_submission/ (handoff.md, requirements.csv, check.py)