# Change log — review pass

Original submission preserved unchanged in `output/original_submission/` (handoff.md, requirements.csv), copied with `output/preserve.py` before edits.

## Corrections
1. **Backup operator naming (over-claim).** Original said Maya "explicitly names" the backup (handoff §1, §5; CSV R09 owner "Maya (to name backup)"). CR-13 says only "explicitly named trained backup" and does not state who names. Revised: namer not stated; Maya flagged only as likely decision-maker.
2. **Signoff dependency (over-claim).** Original said Maya's signoff depends on both accessibility and the rollback plan. CR-13 ties only the accessibility pass to signoff; the rollback plan must be attached "first" (read as before deployment). Revised §4 ordering and R08 status; assumption now notes the before-signoff point is unstated.
3. **Unsupported detail removed.** "Re-test evidence on the release build" — the build is not specified in sources; removed.
4. **R16 owner.** Original listed Maya as owner of TICKET-223; no owner is stated. Changed to "Not assigned (no owner stated)".
5. **Archive ordering.** Added note that archive entries are out of date order (e.g., NOTE-028 dated October01; TEST-07 after NOTE-015) and that document dates were used.
6. **Next-action sequence.** Made explicit step order: accessibility pass → signoff → rollback attached → named operator deploys → smoke test → open to ≤80 accounts.

## Checks performed (re-run after edits)
- Re-read both inputs against every factual claim; counts (12+4, 8, 2/5, 3/3, 12/12, 8/8, 80, 500) match TEST-07, TEST-11, CR-12, DEC-01, MAIL-28.
- Word count and CSV structure checked with `output/check.py` (results in final response).
- No deployments, messages or production access performed; none claimed.

## Not changed (verified correct)
Scope resolution (CR-12 over DEC-01/EMAIL-19), Atlas Mobile exclusion, "instant sync" handling, TICKET-223 treatment, blocked-items list, open data-migration question.
