## Review complete — revised deliverables returned **Output files** - `output/handoff.md` — revised, 894 words (<900 by both whitespace and alphanumeric-token counts) - `output/requirements.csv` — unchanged (18 rows, header `id,current_requirement,owner,status,source`) - `output/original_submission/handoff.md`, `output/original_submission/requirements.csv` — first submission preserved byte-for-byte - `review.py`, `revise.py`, `trim.py`, `check.py` — verification scripts (working files) **Change log** 1. **Corrected an unsupported attribution:** §5 said "Maya/leadership" would name the backup operator, but no input specifies naming authority. Now says "the team," with a new assumptions bullet: CR-13 does not say who names the backup; Maya suggested as signoff owner. 2. **Trimmed ~9 redundant words** ("carries no authority" → "no authority"; "the two project names" → "them") to keep a safe margin under 900 after the addition. 3. No changes to requirements.csv — every row re-verified against source text. **Checks actually performed (via `review.py`/`revise.py`, against the input files themselves)** - 25 factual claims matched verbatim: CR-12/CR-13 dates and terms, 80-account limit, Oct 30 target, test counts (12/12, 8/8, 3/3, 2-of-5 fail), builds a17/a19, keyboard failure, Theo away Oct 30 morning, no backup assigned, Maya cannot deploy, 09:00 Pacific slot, consent=80, runbook ready, TICKET-223 "logged, not approved," EMAIL-19 rejection, all six substantive record dates. - Absence claims confirmed by substring search: "rollback" appears 0 times in archive.md (register states the plan is absent); "backup" appears once (MAIL-28, unassigned). No signoff-granting language anywhere. - All 60 NOTEs verified to contain the demo-only, no-approval, Atlas-Mobile-excluded, "instant sync," and data-preservation clauses; NOTE↔AT ticket numbering verified consistent (NOTE-n ↔ AT-(n+100), range AT-101–160). - CSV re-parsed: 18 rows × 5 columns, no empties/duplicates; all cited record IDs exist in inputs; original files preserved and inputs untouched. **Remaining limitations** (unchanged, stated in handoff.md): rollback-plan owner unnamed (assumed Theo/engineering); test results are Theo's archive summaries without raw artifacts; data-migration requirement unresolved in inputs; status as-recorded through Oct 28, not live-verified. **Estimated human finish time:** ~10 minutes to confirm rollback/backup-naming ownership with Maya and sanity-check CSV statuses (estimate, not measured).