{
  "run_id": "T10-R1-qwen4",
  "model": "qwen/qwen4-max",
  "effort": "high",
  "started": "2026-11-16T05:59:22.203299+00:00",
  "attempt": "approved completion pass",
  "stages": {
    "revision": {
      "status": "complete",
      "answer": "## Review complete — revised deliverables returned\n\n**Output files**\n- `output/handoff.md` — revised, 894 words (<900 by both whitespace and alphanumeric-token counts)\n- `output/requirements.csv` — unchanged (18 rows, header `id,current_requirement,owner,status,source`)\n- `output/original_submission/handoff.md`, `output/original_submission/requirements.csv` — first submission preserved byte-for-byte\n- `review.py`, `revise.py`, `trim.py`, `check.py` — verification scripts (working files)\n\n**Change log**\n1. **Corrected an unsupported attribution:** §5 said \"Maya/leadership\" would name the backup operator, but no input specifies naming authority. Now says \"the team,\" with a new assumptions bullet: CR-13 does not say who names the backup; Maya suggested as signoff owner.\n2. **Trimmed ~9 redundant words** (\"carries no authority\" → \"no authority\"; \"the two project names\" → \"them\") to keep a safe margin under 900 after the addition.\n3. No changes to requirements.csv — every row re-verified against source text.\n\n**Checks actually performed (via `review.py`/`revise.py`, against the input files themselves)**\n- 25 factual claims matched verbatim: CR-12/CR-13 dates and terms, 80-account limit, Oct 30 target, test counts (12/12, 8/8, 3/3, 2-of-5 fail), builds a17/a19, keyboard failure, Theo away Oct 30 morning, no backup assigned, Maya cannot deploy, 09:00 Pacific slot, consent=80, runbook ready, TICKET-223 \"logged, not approved,\" EMAIL-19 rejection, all six substantive record dates.\n- Absence claims confirmed by substring search: \"rollback\" appears 0 times in archive.md (register states the plan is absent); \"backup\" appears once (MAIL-28, unassigned). No signoff-granting language anywhere.\n- All 60 NOTEs verified to contain the demo-only, no-approval, Atlas-Mobile-excluded, \"instant sync,\" and data-preservation clauses; NOTE↔AT ticket numbering verified consistent (NOTE-n ↔ AT-(n+100), range AT-101–160).\n- CSV re-parsed: 18 rows × 5 columns, no empties/duplicates; all cited record IDs exist in inputs; original files preserved and inputs untouched.\n\n**Remaining limitations** (unchanged, stated in handoff.md): rollback-plan owner unnamed (assumed Theo/engineering); test results are Theo's archive summaries without raw artifacts; data-migration requirement unresolved in inputs; status as-recorded through Oct 28, not live-verified.\n\n**Estimated human finish time:** ~10 minutes to confirm rollback/backup-naming ownership with Maya and sanity-check CSV statuses (estimate, not measured).",
      "elapsed_min": 2.0453612242999952,
      "finished": "2026-11-16T06:01:24.925625+00:00"
    }
  }
}
