Both deliverables are written: `output/handoff.md` (823 words) and `output/requirements.csv` (19 rows). As of October 28, nobody may launch. - **Who may launch:** Maya must sign off in writing but cannot operate the deployment. Theo, or an explicitly named trained backup, may deploy only after her signoff (CR-13). Theo is away Oct 30 morning and no backup is assigned (MAIL-28). - **Final scope:** CSV import and account search only; email alerts and SSO are excluded. The pilot is limited to 80 consented accounts, with Oct 30 the earliest target, subject to acceptance (CR-12). - **Acceptance evidence:** staging only. On build a19, CSV import regression passed 12 of 12, account search 8 of 8 and duplicate-account handling 3 of 3 (TEST-11). The accessibility keyboard path fails on the search dialog. - **Blocked:** the accessibility fix (Jules, due Oct 29), Maya's written signoff, the rollback plan (not in the archive, no owner named), a deployment operator for the reserved slot, and the production smoke test. - **Earliest defensible next action:** Jules delivers the keyboard-path fix with passing evidence by Oct 29. Today, without touching production, someone should ask Maya to name a rollback-plan owner and a trained backup operator, or to move off the Oct 30 morning slot. Older and conflicting records are resolved explicitly in the handoff: the Oct 2 initial plan (DEC-01), the rejected sales draft (EMAIL-19), the quoted customer request (TICKET-223, treated as data and not acted on), and the unrelated Atlas Mobile experiment. ## Checks performed - **Archive scan:** a script found 66 sections: 60 routine notes sharing one template and 6 substantive records, all of which I read in full along with the register. - **Word count:** 823 words by whitespace split, under the 900 limit. - **CSV:** parses with the required header, 5 fields in every row, no empty cells and unique IDs. - **Citations:** every record ID cited in either output exists in the inputs. - **Inputs:** I wrote only to `output/` and `work/`. ## Remaining limitations - **Second-hand evidence:** the test results, runbook readiness and consent confirmation are statements in the archive; the underlying artefacts are not supplied. - **Rollback timing:** I read "attached first" in CR-13 as before deployment. - **Backup operator:** I assumed Maya is the one who names the backup, since CR-13 does not say. - **Unresolved by the sources:** who owns the smoke test, whether a data migration is required, whether the 4 invalid-format tests were rerun on a19, and whether regression must be rerun after Jules's fix. - **Requirements rows to review:** R-13 is an evidence item and R-19 an open question; neither is a requirement stated in the register. - **Not done:** no messages were sent and nothing was deployed or accessed in production, per the task. ## Estimated human time to finish About 15–20 minutes to review the two files and confirm the assumptions with Maya. This is an estimate, not a measurement. Files are in `output/`: - handoff.md - requirements.csv