# Review change log

## Revised deliverables
- `output/handoff.md`: 699 whitespace-delimited words, below the 900-word limit.
- `output/requirements.csv`: 15 rows with the required five-column schema.
- Original submission preserved separately in `output/original_submission/handoff.md` and `output/original_submission/requirements.csv`; byte-for-byte equality was checked at preservation time before revisions.

## Corrections and clarifications
1. Added the working-note expectations to preserve existing customer data and attach evidence before closing a launch item (AW-14 and AW-15). These were omitted from the original requirements table. They are explicitly distinguished from approved release gates and are not represented as completed. [inputs/archive.md, NOTE-001–NOTE-060]
2. Removed the implication that the register expressly prohibits deployment before October 30. It specifies an earliest conditional launch target, not a separate date for pre-launch deployment. The revised handoff retains all authorization and readiness conditions and recommends readiness work now, not deployment. [inputs/approved-changes.md, CR-12, CR-13]
3. Clarified that including rollback documentation in the signoff packet is a conservative recommendation, not an explicit register requirement. The plan itself remains required and absent. [inputs/approved-changes.md, CR-13]
4. Labeled duplicate-test coverage and support-runbook readiness as evidence/readiness tracking, rather than independently specified approved gates. Added explicit source-precedence language. [inputs/archive.md, TEST-07, TEST-11, MAIL-28; inputs/approved-changes.md, CR-12, CR-13]

The hold-launch conclusion, authorized roles, final scope and reported test counts are unchanged.

## Checks actually performed
- Re-examined all six non-routine archive records and the two approved changes; checked that all 60 routine notes contain the data-preservation/evidence requests and demo/scope/copy limitations.
- Reconciled DEC-01 and EMAIL-19 against CR-12; reconciled deployment authority and timing against CR-13 and MAIL-28. Treated TICKET-223 solely as an unapproved quoted request.
- Rechecked the reported counts: a17 CSV 12 positive plus 4 invalid-format passes, search 8 passes, alerts 2/5 failures; a19 duplicates 3/3, CSV regression 12/12, search regression 8/8. No cross-build totals or inferred invalid-format rerun were introduced. [inputs/archive.md, TEST-07, TEST-11]
- Ran Python standard-library validation of the revised handoff word count, exact CSV header, unique IDs, complete fields and existence of cited record IDs. All passed. Read back both revised deliverables to review their text and consistency.
- No application tests were run. No deployment, messages, customer exports or production access occurred. Raw inputs were not edited.

## Remaining limitations and estimate
Only source summaries are available, not underlying test artifacts, the runbook or a rollback plan. Accessibility still lacks passing evidence; written signoff and morning operator coverage remain unresolved. The archive does not identify a rollback author, smoke-test owner or Theo's return time. [inputs/archive.md, TEST-11, MAIL-28; inputs/approved-changes.md, CR-13]

Estimated human review and ownership-assignment effort: **15–30 minutes**, not measured. Fixing accessibility, producing evidence and completing operational launch readiness cannot be estimated from this packet.