# Change log — Task 8 review pass (v2)

Original v1 submission preserved byte-for-byte in `output/original_submission/`
(SHA-256 equality verified at copy time). Raw `inputs/` untouched.

## Corrections made
1. **risk-note.md — citation path fixed.** Evidence citation changed from
   `work/check_schedule.py` (a working file not included in the deliverables)
   to `output/check_schedule.py` (the delivered copy). No factual change.
2. **risk-note.md — wording consistency.** Risk 2 heading "Zero room slack"
   contradicted its own body (5 minutes of end slack). Now "Minimal room
   slack", explicitly: no slack at setup start (13:50), 5 minutes at review
   end (14:45 vs room close 14:50, rooms.csv). Word count 467 (<500).
3. **check_schedule.py — usability fix.** Input paths now resolve relative to
   the script file (`pathlib`), so it runs from any working directory; v1 only
   worked from the workspace root. Logic unchanged. Re-ran with cwd=output/:
   exit 0, same result (earliest feasible Room C 14:00–14:45 PT).
4. **invitation-draft.txt — signature clarified.** "Scheduler (draft on behalf
   of Maya)" could imply Maya's endorsement, which no input supports. Now
   "Draft prepared for Maya's review — not yet approved or sent". All required
   content (required/optional people, room, agenda, PT+UTC times) unchanged.

## Unchanged after audit
- **schedule.csv** — identical to v1 (hash-verified). Re-audited every block
  against inputs/availability.csv, inputs/rooms.csv, inputs/constraints.md,
  inputs/update.txt: Room C free 13:50–14:50 covers setup 13:50–14:00 + review
  14:00–14:45; Theo prep 13:30–14:00 inside his 13:30–16:00 window, immediately
  before review; Maya (13:00–15:30) and Jules (14:00–16:00) cover review and
  remote follow-up 14:45–15:00 in the same afternoon windows; lunch and
  09:00–17:00 bounds respected; one main review only; Nora optional/absent.
- **Earliest-start conclusion** — re-confirmed by full grid enumeration:
  feasible starts are 14:00 C, 14:05 C, 14:10 B, 14:15 B; mornings infeasible
  (B: follow-up exceeds Maya's 11:00 cutoff; C: room closes 10:30). All input
  boundaries are 5/10-minute aligned, so the 5-minute grid misses nothing.
- **One open decision** — security owner identity / beta-flag approval remains
  unresolved per inputs/update.txt; not assumed to be Maya.
- No source conflicts found; no constraint was relaxed.

## Checks actually performed this pass
- SHA-256 copy verification of preserved originals; input file hashes recorded.
- CSV parse (4 rows) and PT→UTC (+7h) assertion on all 8 time fields.
- Revised checker executed via subprocess with cwd=output/ (exit 0; earliest
  feasible Room C 14:00–14:45; Tuesday confirmed; Nora non-overlap confirmed).
- Risk-note word count 467 < 500.
- Invitation token check: Maya/Theo/Jules/Nora, Room C, AGENDA, UTC times,
  NOT SENT marker all present.

Nothing was sent or booked in either pass.