# Change log: review pass on Task 8

The original submission is preserved unchanged in `output/original-submission/` (copies confirmed byte-identical by SHA-256 before any edit).

The plan itself did not change: main review 14:00–14:45 Pacific (21:00–21:45 UTC) in Room C.

## Corrections

1. **Factual error about Nora (risk-note.md).** The original said the Room B 10:00 review was "the only slot Nora could attend". Nora is free 10:00–11:00 (availability.csv), so the rejected 10:10 Room B review would also have fitted her. The note now says she could have joined only a morning review.
2. **Source tension made explicit (risk-note.md).** Added a short section: Maya asks for the earliest start with all required attendees (update.txt), and all three are first free together at 10:00, but no morning start meets every hard constraint. The original implied this through the rejected alternatives without stating it.
3. **Overstated note in schedule.csv.** The Theo prep row said "no other meeting scheduled over it". The inputs give availability windows only, so the row now says only the room setup overlaps it in this plan and Theo's other meetings are not visible.
4. **Invitation completeness (invitation-draft.txt).** The fallback now lists Theo's prep and room setup times as well as the review and follow-up. The greeting names Nora as optional, the "earliest start" sentence mentions the follow-up, and the notes agenda item says a note-taker is still to be agreed.
5. **"Short notice" risk wording (risk-note.md).** Replaced "room and calendar data may have changed since" with "I could not re-check calendars", which is what I can actually state.
6. **Check script moved into output/.** `output/verify_schedule.py` now also reports Nora's availability for each candidate, confirms no feasible start before 12:00, and checks every Pacific/UTC pair in the invitation.

## Checked and left unchanged

- All four blocks, their Pacific and UTC times, durations, room and attendee lists.
- The one decision still needed: the security owner's beta-flag decision, owner unidentified, not assumed to be Maya (update.txt).
- Nothing was booked or sent; both the CSV status column and the invitation header say so.