# Field Notes — decision log and coordination notes

**As of October 20, 2026, 10:00 Pacific. Draft only; nothing sent or executed.** All dates below are 2026 and Pacific. Status means what the documents evidence, not a live project-system check.

## Evidence key

- **B**: `inputs/01-original-brief.md`, **Original brief — October 14, 09:00 Pacific**.
- **N**: `inputs/02-meeting-notes.md`, **Planning notes — October 16, 14:00 Pacific**.
- **E-P**: `inputs/03-email-thread.txt`, **Field Notes decisions / Priya, October 18, 09:00 Pacific**.
- **E-A**: same file and subject, **Alex, October 18, 12:30 Pacific**.
- **E-J**: same file and subject, **Jonah, October 19, 08:10 Pacific**.
- **CR**: `inputs/04-approved-change.md`, **Approved change request — CR-07**, approved by Priya October 19, 16:00 Pacific.
- **Q**: `inputs/05-open-questions.txt`, **October 20, 09:30 Pacific — Mei to Priya**.

These keys refer to the precise input records above. `COMMON.md` and `PROMPT.md` supply delivery requirements and the as-of time, not additional project approvals.

## Approved baseline and supersession

| Topic | Controlling decision | Reconciliation / evidence |
|---|---|---|
| Event | October 30, 11:00 Pacific; 45 minutes | E-P supersedes B's October 29, 10:00; CR makes the new start final. Calculated end is 11:45 Pacific (11:00 + 45 minutes), not a separately approved calendar entry. |
| Platform and attendance | MeetRoom; maximum 80 attendees | E-P explicitly keeps MeetRoom and replaces B's 120-person cap. N's StreamHall suggestion was never a decision. |
| Price and budget | Free entry; CAD 1,200 cap | B and E-P agree. N's paid-ticket proposal has no approval and does not change this. |
| Speaker | Confirmed for October 30, 11:00; live attendance consent only | E-A. No supplied later record establishes written recording/replay consent. |
| Recording/replay | No promise without written speaker consent; absent consent, run live-only | CR supersedes B's unconditional instruction to record and email replay to all registrants. E-J reports the old replay promise is still on the draft page; remove it now rather than waiting for consent. Written consent would require review of its scope, not an assumption of unrestricted use. |
| Launch gates | Captions required; captions and capacity tests must pass October 22. All launch copy stays draft until platform test passes. Priya must approve publication. | N, E-P, B and CR are consistent. CR schedules conditional registration opening October 23 at 09:00 and final approval October 22 at 17:00. No test pass or launch approval is evidenced. |
| Owners and deadlines | Priya coordinates; Jonah corrects page by October 21, 17:00; Mei owns invitations due October 22, 12:00; Alex follows up consent October 21 and supplies slides October 27, 17:00; Priya assigns tester October 21, 12:00 and gives final launch approval October 22, 17:00 | B plus CR. CR refines the original page/email dates and replaces B's October 26 slides deadline. Alex remains host under B. Consent follow-up has no stated time and is not a guaranteed consent receipt deadline. |
| Paid advertising | Hold until separate written campaign approval | CR strengthens N's earlier speaker-confirmation gate. E-A's confirmation alone does not authorize spending. No campaign approval is supplied. |

## Open issues, not decisions

1. **Testing ownership and schedule (A01, A07–A09).** CR expressly leaves the test owner unassigned and gives Priya an assignment deadline. No test time, detailed pass criteria, duration, remediation window, or results are supplied. Testing on October 22 must fit ahead of the 17:00 approval to keep the proposed operational sequence feasible; that intraday cutoff is a coordination recommendation, not an additional approved deadline. If the gate is missed, keep registration closed and obtain a revised plan from Priya. Do not invent a replacement launch date or platform.
2. **Recording/replay consent and wording (A02–A04, A06, A14).** Alex owns follow-up, not the speaker's decision. Live-only is an approved fallback, so missing recording consent need not block launch. Proposed page wording: “Join us live October 30 at 11:00 Pacific. Free registration; 80 attendees maximum.” Priya is the proposed wording decision owner; no supplied record approves this exact sentence. Update drafts promptly if scoped written consent is subsequently documented; do not automatically reinstate the original blanket replay promise. [E-A, E-J, CR]
3. **Invitation consent and recipients (A05, A12).** Q asks whether to use all 600 newsletter subscribers or only the webinar opt-in segment and explicitly says no decision or verified consent scope exists. Neither audience is established as authorized. Verification and audience decision owners are unspecified; propose Priya coordinate assignment. Mei can finish copy without recipients. Hold the send until the audience and relevant consent evidence are resolved; this is a recommended safeguard, not a claim about external law. This issue is separate from speaker recording consent and does not itself require stopping page corrections or platform testing. [Q]
4. **Publication/send execution and timing (A06, A10–A12).** Jonah owns corrections, Mei owns invitations, and Priya owns approval; the documents do not explicitly identify who operates publication or sending, or give a send time. Do not assume Mei is excluded from sending: confirm whether she also executes the send. Propose Priya confirm these roles and coordinate invitations with live registration. CR calls October 22, 12:00 the invitations deadline, without specifying the delivery stage. This plan treats it as copy-ready, not a send time, because Q says Mei can finish draft copy without recipients and E-P holds launch copy in draft pending tests. This is a planning interpretation to confirm, not a newly approved scope restriction on Mei. [B, E-P, CR, Q]
5. **Unapproved alternatives.** StreamHall, paid tickets, paid campaigning without written approval, and a full-list invitation send are not agreed decisions. No proposal here changes the final event start, free entry, or budget cap. [N, E-P, CR, Q]

## Recommended execution order

- **Now through October 21:** Priya assigns the tester and resolves operational gaps; Jonah removes the unsupported replay promise and corrects the draft; Alex seeks scoped written consent. Begin audience verification in parallel. Proposed copy confirmation must not delay removal of the stale promise. [A01–A05]
- **October 22:** Mei has invitations copy-ready by noon regardless of audience selection (the planning interpretation above; send timing still needs confirmation). Complete and document captions/capacity tests in time for Priya's 17:00 review. Review page and invitation copy against actual consent status. Obtain explicit launch approval only after the test passes. If not ready, use the escalation path rather than assuming approval. [A06–A09]
- **October 23, 09:00:** Assigned operator opens registration only if the test and approval gates are satisfied. Send invitations only after audience verification, approval, and registration availability; exact send time remains to be set. [A10–A12]
- **October 27 / October 30:** Alex completes slides by October 27, 17:00, then hosts at the final October 30, 11:00 start for 45 minutes. Preserve live-only treatment unless written consent supports a different plan. Paid advertising stays on hold independently. [A13–A15]

## Planning conventions and limitations

- Action-plan rows or clauses marked **proposed** are coordination recommendations, not approvals or claims that someone accepted ownership. Audience verification and the resulting send hold are recommended safeguards, not newly approved policy. A03 is a follow-up action, not proof of consent: inspect actual written consent before any recording/replay promise or recording/replay activity. Unassigned means the sources do not supply an owner. No-time deadlines remain no-time deadlines; no end-of-day time has been invented.
- The only evidenced production progress is Jonah's October 19 report that the landing draft is ready; its corrections are not evidenced. No completion beyond that reported draft, test execution, written recording/replay consent receipt, audience verification, spending, invitation send, or launch approval is asserted. E-A does evidence live-attendance consent; that is distinct from the missing written recording/replay consent.
- No access to the draft page, platform, consent records, mailing system, or team calendars was provided. Resolving these gaps requires human follow-up; the documents alone cannot establish readiness.