# Review change log

Reviewed against `COMMON.md`, `PROMPT.md` and all five supplied input files. The project as-of time remains October 20, 2026, 10:00 Pacific; this review adds no later project evidence.

## Revised files

- `action-plan.csv`: clarified that Alex's follow-up is not evidence of written consent; removed any implication that proposed wording confirmation blocks prompt removal of the stale replay promise; added operator assignment to the publication prerequisites; distinguished approved test-owner assignment from proposed test-planning details; labeled the invitation send hold as a recommendation.
- `decision-log.md`: corrected the overly narrow statement that Mei owns the draft only. CR-07 assigns her invitations, while the actual sending operator and send time remain unconfirmed. Treating October 22 noon as copy-ready is now explicitly a planning interpretation supported by the draft hold and Mei's open question, not a newly approved scope restriction. Distinguished evidenced live-attendance consent from absent written recording/replay consent. Labeled 11:45 as the calculated end, not a proposed new time.
- `update-email.txt`: made the year/time-zone convention explicit and clarified invitation copy readiness versus unresolved send timing. Final email is **214 whitespace-delimited words**, including headers and citations, within the 220-word limit.

Evidence for these clarifications: `inputs/03-email-thread.txt`, **Field Notes decisions / Priya October 18 09:00; Alex October 18 12:30; Jonah October 19 08:10**; `inputs/04-approved-change.md`, **Approved change request — CR-07**; `inputs/05-open-questions.txt`, **October 20 09:30 — Mei to Priya**.

## Checks actually performed

- Re-read all assignment and source files; compared final event details, deadlines, consent rules, launch gates and advertising hold with the dated approvals. No change to the controlling baseline was needed.
- Parsed final CSV with Python's standard-library CSV reader: exact seven-column header; 15 records with unique IDs; no empty or surplus fields; dependency and decision-log action references resolve; cited CSV input paths exist.
- Read back the revised deliverables and checked cross-file consistency. The final small wording edits replace “draft deadline” with “invitations deadline” and tidy the email salutation; the CSV was then reparsed and the email recounted.
- Verified arithmetic: October 30, 11:00 + 45 minutes = 11:45 Pacific.
- Verified the three preserved originals against SHA-256 values captured before revision. Original files are in `original-submission/`; raw task inputs were not edited.

## Handoff and remaining limitations

Use the revised `action-plan.csv`, `decision-log.md` and `update-email.txt` in this directory; this file records the review. The preserved originals are reference copies, not the current plan.

No messages were sent, and no platform, page, mailing-system or consent-system checks were performed. Tester assignment, exact test slot/results, written speaker recording/replay consent, audience authorization, and publication/send execution still require human resolution. Proposed owners and dates remain proposals. Estimated human effort for initial coordination: **20–30 minutes**, excluding testing and waiting for responses; this is an estimate, not measured work or a completion guarantee.
