# Change log — Task 4 review pass (rev. 2)
Review performed as of the scenario time Oct 20, 2026, 10:00 Pacific, against `inputs/01`–`05`. Original submission preserved unmodified in `output/original-submission/` (verified byte-different from revised files by script).

## Corrections made
1. **A02 status de-escalated "in progress" → "open"** (`action-plan.csv`). Evidence: `inputs/03-email-thread.txt`, Alex Oct 18 12:30 says "I **will** request it by Oct 21" — a commitment, not evidence the request was sent. The original wording risked implying an action had begun without evidence. Also noted in `decision-log.md` §4.1/§6 and the email ("not yet evidenced as sent").
2. **A12 owner relabeled UNASSIGNED/proposed** (`action-plan.csv`; `decision-log.md` §3 new bullet). No input assigns anyone to confirm/communicate the run mode; "Priya with Alex" is a coordinator proposal, now labeled like the other unassigned owners (A03/A05/A09/A10).
3. **Email phrasing fixed**: "proposed live-only default pending consent" → "CR-07 mandates: no recording or replay promise without written speaker consent; live-only if consent is absent." Live-only is a mandated fallback (`inputs/04-approved-change.md`, CR-07), not a proposal; only the replacement wording is unconfirmed. Email re-counted: **212 words ≤ 220**.
4. **A14 now states the CAD 1,200 budget cap** (`action-plan.csv`), sourced to `inputs/01-original-brief.md` and Priya Oct 18 (`inputs/03`). Previously the cap appeared only in the log/email; cross-file consistency check flagged its absence from the CSV.
5. **Minor precision**: A04 status now says Jonah's offered date/cap updates are "not evidenced as completed" (`03`, Oct 19: "I can update … today" is an offer). Added unresolved item §4.7 to the log: no fallback schedule exists in any input if Oct 22 tests fail. A14 campaign-initiation proposal made explicit in log §3.

## Checks supporting items left unchanged
- **Conflict resolution re-verified** against sources: Oct 30 11:00 final (CR-07; Priya Oct 18; guest confirmation in `03`); MeetRoom kept (Priya Oct 18 overrides Jonah's undecided StreamHall suggestion in `02`); 80 cap, free, 45 min, CAD 1,200 (Priya Oct 18); slides Oct 27 17:00 supersedes brief's Oct 26; registration Oct 23 09:00 gated on Oct 22 tests (CR-07); copy in draft until test passes (Priya Oct 18); ads need separate written approval, speaker confirmation insufficient (CR-07 over `02`).
- **CSV usability** (script): exact required header; 14 rows × 7 fields; unique IDs A01–A14; every dependency reference resolves.
- **Email limit** (script): 212 whitespace-separated words including To/Subject lines, ≤ 220; marked DRAFT/not sent.
- **Cross-file fact consistency** (script): Oct 30 / 11:00 / 80 / MeetRoom / CAD 1,200 / key dates present in all three deliverables (CSV dates in ISO format 2026-10-21 etc.).
- **No fabricated actions/tests**: statuses claim only what inputs evidence; test results, consent, approvals, sends remain unclaimed.