# Field Notes — decision log and coordination notes

**As of October 20, 2026, 10:00 Pacific. Draft only; nothing sent or executed.**
All dates are 2026 and all times Pacific. An unspecified time remains unspecified; proposed targets are not approved deadlines. Status reflects only supplied evidence, not live project verification.

## Source register
- **S1:** `inputs/01-original-brief.md`, “Original brief — October 14, 09:00 Pacific”.
- **S2:** `inputs/02-meeting-notes.md`, “Planning notes — October 16, 14:00 Pacific”.
- **S3-P:** `inputs/03-email-thread.txt`, “Field Notes decisions”, Priya, October 18, 09:00 Pacific.
- **S3-A:** same file and subject, Alex, October 18, 12:30 Pacific.
- **S3-J:** same file and subject, Jonah, October 19, 08:10 Pacific.
- **S4:** `inputs/04-approved-change.md`, “Approved change request — CR-07”, Priya approval October 19, 16:00 Pacific.
- **S5:** `inputs/05-open-questions.txt`, Mei to Priya, October 20, 09:30 Pacific.

The CSV uses these source keys. `COMMON.md` and `PROMPT.md` supply delivery requirements, not project approvals. All seven supplied files were read.

## Agreed decisions and superseded instructions
| ID | Current authoritative position | Resolution and evidence |
| --- | --- | --- |
| D01 | October 30 at 11:00 Pacific; 45 minutes. | S3-P replaces S1's October 29 at 10:00; S4 makes the new date/time final. S3-A confirms guest availability for the new slot. |
| D02 | MeetRoom; 80-attendee cap; free registration; CAD 1,200 cap. | S3-P explicitly retains platform, free entry and budget and replaces S1's 120-person cap with 80. StreamHall and paid tickets were suggestions only (S2), not approvals; no later approval changes these decisions. |
| D03 | Captions required; test platform before publication. Registration opens October 23 at 09:00 only if captions and capacity tests pass October 22. Keep launch copy in draft until test pass. | S2 establishes captions/testing; S3-P adds draft hold; S4 sets conditional opening. No test results are supplied. |
| D04 | Priya must assign test owner by October 21 at 12:00; final launch approval due October 22 at 17:00. | S4. Test owner remains unassigned in supplied evidence. S1's Priya publication approval requirement continues; a test pass alone is not approval. |
| D05 | Jonah: landing corrections October 21 at 17:00. Mei: invitations October 22 at 12:00. Alex: slides October 27 at 17:00; consent follow-up October 21, no time stated. | S4 refines S1's page/email dates and replaces the October 26 slide deadline. S3-J establishes draft readiness, not completion of corrections. S4 invitation deadline is treated as a copy deadline, not a send authorization, given draft hold and unresolved recipients (S3-P, S5). |
| D06 | No recording/replay promise without written speaker consent; absent consent, live-only. | S4 supersedes S1's unconditional recording/replay instruction. S3-A confirms live attendance consent only, not recording/replay. No written recording/replay consent is supplied. Remove the existing replay promise identified in S3-J; do not wait for consent to make the page safe. |
| D07 | Paid advertising stays on hold pending separate written campaign approval. | S4 supersedes S2's speaker-confirmation-only prerequisite. Guest confirmation (S3-A) does not authorize spending. Budget headroom is not campaign permission. |
| D08 | Priya coordinates; Alex hosts. | S1 roles remain unchanged. Coordination does not establish that Priya executes testing, publication, consent verification or invitation sends. |

## Proposals and open decisions — not approvals
1. **Test ownership and scheduling (A01–A02, A07):** Priya's assignment deadline is approved; the test slot, acceptance checks/evidence and retest window are not supplied (S4). Propose agreeing them on October 21 and completing tests before the October 22, 17:00 review. No invented intermediate time or test outcome is used. Exact capacity/captions test procedures require the assigned owner's plan.
2. **Draft deadline versus test/approval gates (A06–A08):** Mei's noon draft precedes the 17:00 approval; tests have only a calendar date. Draft completion need not await tests, but publication/send must. Propose an early-enough test slot to allow fixes and review. If gates cannot pass in time, keep drafts unpublished and ask Priya for an explicit revised schedule; neither a new opening time nor automatic approval is authorized (S3-P, S4).
3. **Speaker consent and page wording (A03–A04):** Alex follows up October 21 (S4). Proposed replacement: “Live-only webinar; no recording or replay is promised.” Priya reviews it with the page. If written consent arrives, verify its recording/replay scope and revise copy through approval; consent is not itself a decision to produce or distribute a replay. Replay operations and timing are unassigned, and the original blanket replay instruction is not the current fallback (S1, S3-A, S4).
4. **Invitation audience and consent (A05, A11):** Neither all 600 newsletter subscribers nor the webinar opt-in segment is approved by S5. Priya is the recipient of the question, not an explicitly assigned consent verifier. Propose that she designate a verifier/decision owner and resolve scope by the October 22 noon draft target if possible; this is not a sourced deadline. Copy can finish independently. Hold sending until permission evidence and recipient selection are resolved. Speaker consent cannot resolve subscriber consent.
5. **Publication and send execution (A10–A11):** No publication operator, invitation sender or invitation send time is assigned in S1–S5. Do not infer these from Jonah's design or Mei's copy role. Propose assigning operators before opening and sending invitations after registration is available. If audience remains unresolved, escalate the invitation hold; it is not stated as a separate registration-opening condition in CR-07.
6. **Advertising (A14):** No campaign approval is supplied. A campaign need not be created or approved to launch this free webinar (S3-P, S4).

## Execution sequence and assumptions
- First assign the test owner and settle the test schedule; in parallel Alex requests consent, Jonah removes unsupported promises and corrects the draft, and Mei drafts invitations (A01–A06).
- Run and document the October 22 tests, then obtain Priya's final approval. Conditional opening is October 23 at 09:00; unresolved recipient permission blocks sending, not drafting. Failed or late tests require escalation, not a guessed replacement date (A07–A11).
- Complete slides October 27; host October 30 using the consent mode actually authorized (A12–A13). Planned end is **11:45 Pacific**, calculated from 11:00 plus 45 minutes (S1, S3-P); this is not an extra approved agenda milestone.
- No end-of-day time is assumed for date-only deadlines. No actual costs, test results, corrected page, final invitation, written speaker consent, campaign approval or verified mailing permissions were supplied. No external systems were checked and no messages were sent.

## Handoff
Deliverables: `output/action-plan.csv`, `output/decision-log.md`, `output/update-email.txt`. `output/build_deliverables.py` is the reproducible generation/validation helper.

Checks performed by the helper: CSV header/row shape, unique action IDs, referenced action IDs, source-key presence, email word count at or below 220, and output existence. Editorial review compared decisions, ownership and dates to all five project inputs; no project actions or operational tests were performed.

Remaining work requires the named people: owner assignment, test schedule/results, consent evidence, recipient decision, copy corrections/approval and execution roles. Estimated human review/triage: **20–30 minutes**, excluding waiting for decisions and actual testing, copy production or event work. This is an estimate, not measured completion time.