I reviewed the submission against the inputs and made five fixes. Two status entries claimed more than the files show, one deadline was reinterpreted without saying so, the email was right at the 220-word limit, and my earlier handoff was out of date. The decisions, proposals, open issues and sequence of next steps all held up. The original files are saved unchanged in `output/original-submission/`. **Change log** 1. **A01 (platform test owner):** the status said no owner was assigned "as of Oct 20 10:00". The inputs only show the owner was unassigned at Oct 19 16:00 (CR-07), so the status now says that. The matching entry in the decision log is corrected too. 2. **A02 (speaker consent):** the status said "In progress". Alex only committed on Oct 18 to request consent by Oct 21, so it is now "Pending", noting the inputs don't show the request was sent. The decision log matches. 3. **A05 (Mei's invitations):** CR-07 says "invitations due Oct 22 12:00". I had turned that into "draft copy" without flagging it. The row now quotes CR-07 and labels the draft reading as an assumption. The email now says "invitations due Oct 22 at 12:00, kept in draft". 4. **Email length:** after fix 3 the email came to 221 words. I shortened two phrases, and it is now 216 words counting the DRAFT line, address lines and signature. 5. **Handoff accuracy:** my first handoff said I hadn't opened the input files with the tool. I have now read all five. **Checks performed** - I read the five inputs and compared every date, time, number and owner. All of them match. - I re-checked each conflict and how it was resolved: - Oct 29 → Oct 30, and 120 → 80 seats (Priya's Oct 18 email, CR-07). - Slides due Oct 26 → Oct 27 17:00 (CR-07). - "Record and email replay" → no recording or replay promise without written consent (CR-07). - "No paid campaign until the speaker confirms" → paid ads need a separate written approval (CR-07). - StreamHall and paid tickets remain proposals. - I ran the updated `output/check.py`. It confirmed the CSV has the seven required columns, 14 unique actions and no empty fields, and that every dependency points to a real action. It also confirmed every row cites a source and the email is 216 words. **Remaining limitations** - The meaning of Mei's Oct 22 deadline is still an assumption. - The unresolved owner, scheduling and consent questions stay open; the inputs don't answer them. - The email is a draft and has not been sent. A human would need about 30–45 minutes to finish: review the files, get Priya's decisions and send the email. This is a guess, not a measurement. Files are in `output/` (the helper scripts `preserve.py` and `revise.py` to `revise4.py` are not deliverables): - action-plan.csv - decision-log.md - update-email.txt - change-log.md - check.py - original-submission/